Hi,
I upgraded tfs 2010 to tfs 2013
We are using CMMI template.
After the upgrade i tried to upload the reports to MSF for CMMI Process Improvement 2013.2
But i got the following error.
Exception Type: Microsoft.TeamFoundation.Client.PcwException
Exception Message: The following element contains an error: RequirementBacklog.
TF400517: The value of this element is set to: Microsoft.VSTS.Scheduling.Size. Y
ou must set the value to a field that exists in all of the work item types that
are defined in RequirementBacklog. The field does not exist in the following wor
k item types: Requirement.
-- Inner Exception --
Exception Message: The following element contains an error: RequirementBacklog.
TF400517: The value of this element is set to: Microsoft.VSTS.Scheduling.Size. Y
ou must set the value to a field that exists in all of the work item types that
are defined in RequirementBacklog. The field does not exist in the following wor
k item types: Requirement.
Object reference not set to an instance of an object. (type SoapException)SoapEx
ception Details: <detail xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi=
"http://www.w3.org/2001/XMLSchema-instance" InnerExceptionType="NullReferenceExc
eption" InnerExceptionMessage="Object reference not set to an instance of an obj
ect." />
Exception Stack Trace: at Microsoft.TeamFoundation.Client.Channels.TfsHttpCli
entBase.HandleReply(TfsClientOperation operation, TfsMessage message, Object[]&
outputs)
--- end Exception entry ---
2014-09-12T17:55:08 | Module: BatchTeamProjectCreator | Thread: 1 | Microsoft.Vi
sualStudio.TeamFoundation.PCW.ProjectCreationException: TF30170: The plugin Micr
osoft.ProjectCreationWizard.WorkItemTracking failed during task ProcessConfigura
tion from group WorkItemTracking.
But i Configured it after the upgrade using Team web access.
Any one please help me to solve my problem.