Hi,
I am using TFS 2013.3 which integrated Test Plans and Test Suites as work items.
When we create test plans in MTM or in the WEB based platform and generate Test Suites under it, no links are created between the their work items.
Is this by design? If so what is the logic behind this?
If not, what are we doing wrong?
Thanks,